Hot Topics Air
Quality
Property Database Property Tax Pay Online Our
Community
 Emergency    Operations Borough
 Offices
CSS Drop Down Menu by PureCSSMenu.com







Chena Riverbend Conceptual Plan (2004)

 The Old City of Fairbanks Landfill is part of the FNSB’s larger economic development project called the Chena Riverbend Project (CRB).  The CRB was a conceptual plan looking ot develop a community centerpiece highlighting the Chena River.  This 101 acre project was designed to ultimately enhance existing facilities along or adjacent to the Chena River, expand on tourism opportuniteis and promote the economic growth of our community. 

 The following is a link to a Power Point presentation that further describes this Plan.

- Chena Riverbend Conceptual Plan by former Mayor Whitaker (dated 10/2004)
       
Powerpoint Presentation
        pdf File Format 

 

 
FNSB only

Fairbanks North Star Borough

PO Box 71267-1267
809 Pioneer Road

Fairbanks, Alaska 99701
907.459.1000

Home | AboutAir Quality | Assembly Members | Bids Online| Boards/Commissions | Contact Us |
Employee Webmail | Employment | Holiday Closures| Hot Topics | Links | Property Database | Site Map
Contact Webmaster
Copyright © 2011 Fairbanks North Star Borough. All Rights Reserved.